The first step is to remove the rootzone to about 4 inches below the surface using shovels and utility carts:
Then greens sand mixed with a soil amendment called Profile is added:
The sand is watered and compacted using a hand tamp just enough so settling will not occur:
The washed sod is then laid:
Pinki supervises the clean-up process:
We have purposely left the sod a bit low. It is much easier and better to topdress up then to have to remove material because it is too high.
No comments:
Post a Comment