Wanted to go through some of the steps we took to build the new bunker on hole #2. First the three small stacked sod bunkers were removed:
Then, David Whelchel from Hurdzan/Fry Environmental Golf Design came to inspect the shaping. In this picture David (in black jacket with paint gun) discusses how far up the sand will go with McDonald & Sons Project Manager Kyle Trzaskos:
Next, we had to remove some rocks from the base of the bunker:
However not all the rocks were small enough to be removed so a rock hammer was brought in:
Then drainage trenches were dug:
Next a liner was installed:
Then the drainage pipe and gravel:
Sand is installed after the drainage pipe:
Then sod:
Finished product: