Monday, February 6, 2012

Winter Shutdown Renovation Work-#2 Bunker

Wanted to go through some of the steps we took to build the new bunker on hole #2. First the three small stacked sod bunkers were removed:


Then, David Whelchel from Hurdzan/Fry Environmental Golf Design came to inspect the shaping. In this picture David (in black jacket with paint gun) discusses how far up the sand will go with McDonald & Sons Project Manager Kyle Trzaskos:



Next, we had to remove some rocks from the base of the bunker:





However not all the rocks were small enough to be removed so a rock hammer was brought in:







Then drainage trenches were dug:



Next a liner was installed:



Then the drainage pipe and gravel:



Sand is installed after the drainage pipe:



Then sod:



Finished product: