Par Three Tee Renovation and Expansion Update #5

We were fortunate to have the weather cooperate with us last week and was able to install drainage on #6 and #13 Blue tees.



Once drainage was completed the tee rootzone mix installation began on #6 and #13 Blue tees.



This mix is spread to a depth of 6 inches underneath what will be the teeing area. To ensure quality this rootzone mix has been tested for several different characteristics including particle size, sand fractions, saturated conductivity and moisture retention.

The back tee on #16 has had irrigation installed and will have drainage installed today.


If the weather holds out we may have the project completed within a week.