The back portion of #13 blue tee was able to be cut this week resulting in greater tee space. Between the front and now the back both being expanded the following picture gives a preview of just how much tee space we will gain from this project.



The next step is the digging of the footer for the back wall on #13 tee.


This wall will be a retaining wall but like the front retaining wall will be faced with the field stone that was removed and therefore look the same as the other walls on the course.