Weather and unforeseen conditions can/will change the schedule.
-Pour concrete on cart path between holes #2 and #3. Also pour concrete where cart path was cut for electrical line installation next to #3 green
-Bamboo removal next to #2 fairway
-Clean-up of area to left of #7 left side fairway bunker
-Remove weak turf areas in greens for sodding. Currently due to the harsh winter the sod farms will have greens height bentgrass sod after May 1st.
No comments:
Post a Comment