Today the excavation for the walk paths on #3 and #7 is being completed. These along with the cart path between #2 and #10 will have the
PorousPave material installed as early as next week, depending on the weather.
 |
#3 Walk Path from Black Tee to Cart Path |
 |
Removal of Existing Brick Path to #7 Tee
|
 |
Excavation for New Walk Path to #7 Tees |
We are hoping to have at least 20,000 sq. ft. of sod laid tomorrow (Tuesday) between holes #2 and #10. The rest of the sod is scheduled to be installed on Wednesday. Hopefully the weather will cooperate and our schedule remains intact.