#3 and #7 Walk Path Preparation

Today the excavation for the walk paths on #3 and #7 is being completed. These along with the cart path between #2 and #10 will have the PorousPave material installed as early as next week, depending on the weather.

#3 Walk Path from Black Tee to Cart Path

Removal of Existing Brick Path to #7 Tee

Excavation for New Walk Path to #7 Tees


We are hoping to have at least 20,000 sq. ft. of sod laid tomorrow (Tuesday) between holes #2 and #10. The rest of the sod is scheduled to be installed on Wednesday. Hopefully the weather will cooperate and our schedule remains intact.