Monday, November 28, 2016

Winter Schedule

This week our focus is on blowing out the irrigation system and leaf clean-up. Bunkers are our top priority for removing leaves then along rock wall and secondary rough areas.

We will also be moving to winter pins and tee locations. The goal of leaving the tees in one place all winter is to only affect one area of the tee since we will not see re-growth from divots over the winter. Then in the Spring the area that was used all winter can be re-seeded/sodded instead of having to repair areas over the entire tee if we were to move tee locations during the winter.


Tuesday, November 15, 2016

Course Update 11.15.16

The first group of staff members returned to their homes in Mexico last Friday. The next group will leave this Friday and the final group at the end of the month. Their hard work and dedication to the course is very much appreciated.

For the next several weeks our focus will be on leaf mulching and removal. Once all leaves have fallen and are cleaned from the course we will return to tree and underbrush removal.


Friday, November 4, 2016

Updated Project Photos

#8 Green Surrounds

We sodded portions of the green surrounds to Turf Type Tall Fescue and added speciality irrigation to the left side.


#11 Tree Removal

Grouping of trees removed short right of fairway . Will be grassed this Winter/Spring after stump grinding.


#13 Bunker Surrounds

Sodded to Turf Type Tall Fescue.




Tuesday, November 1, 2016

Weekly Schedule for October 31-November 6, 2016

Weather and unforeseen conditions can/will change the schedule.

-Mulch leaves
-Sod #13 bunker surrounds on Wednesday
-Install specialty irrigation to left of #8 green and sod on Wednesday
-Additional tree work to right of #11 fairway
-Continue mowing secondary roughs and apply pre and post-emergent weed control