Weather and unforeseen conditions can/will change the schedule.
-Continue with edging and sand distribution of bunkers on the back 9
-Installation of irrigation on #18 fairway bunker faces
-Second application of the AquaSpheres in ponds
-Slit seeding of thin areas on tees
-Collar aerification
-Pump installation at #8 pond
No comments:
Post a Comment