Friday, March 18, 2011

Well Capped and Electrical Installation at Halfway House

As part of the creek project we are also bringing power to the halfway house. Here's a quick picture of the electrical panel being installed.


Also, the well has finished being drilled and is now capped!


This well was dug to a depth of 540 feet and is 8 inches wide. On Tuesday the pump will be installed. Afterwards we will need to test the system and hope to get 250 gallons per minute from this well.