As part of the creek project we are also bringing power to the halfway house. Here's a quick picture of the electrical panel being installed.
Also, the well has finished being drilled and is now capped!
This well was dug to a depth of 540 feet and is 8 inches wide. On Tuesday the pump will be installed. Afterwards we will need to test the system and hope to get 250 gallons per minute from this well.
No comments:
Post a Comment