Tuesday, August 30, 2011

Weekly Schedule for August 29-September 4, 2011

Weather and unforeseen conditions can/will change the schedule.

We are seeding half the driving range tee today (Tuesday). Bunker washouts will continue to be repaired. Greenside bunkers are done and we hope to have the fairway bunkers done by Thursday.

Monday, August 29, 2011

Hurricane Irene-The Day After

Besides bunker washouts and erosion behind the lake overflow structure on #6 pond we came out fairly well. The course received just over 6 inches of rain but is drying out nicely. I'd expect carts to be on fairways starting tomorrow (Tuesday).

Sunday, August 28, 2011

Hurricane Irene-10 am Update

At least 6 inches of rain so far here at the course. Our gauge only goes up to 6 inches!


As of now no large trees are down. However, it is quite gusty outside and the potential for trees and limbs to fall is still very high.

We had one clogged drain on the course, this was behind #8 green.


It's been cleared and is now a non-issue. Here is the view from the drain gate towards #8 green while the water is going into the grate after being unclogged:



Here's the view after it's been unclogged from the drain grate up the walk path towards #9 tee:

Bunker washouts will take us the better part of the week to clean-up:


Will have a complete report once the wind subsides later today or tomorrow. For now there is still high potential for downed trees and limbs on the course.


Saturday, August 27, 2011

Hurricane Irene Storm Prep

There are several things that we are doing to prepare for the upcoming storm.

All fuel tanks, equipment and portable storage containers are getting filled with fuel:


Anything on the course that may get blown or washed away from the rain is being taken and stored at our maintenance facility, such as the trash barrels:



Another thing being done is to ensure all drain grates are clear so water has free access to enter without getting clogged:



And anything else that might need some extra support is getting a helping hand:



We have a meteorological service that we work with as well to obtain site specific forecasts for Fieldstone.

Most people are asking about my dog Pinki. As you can see she is also hunkering down for this event:




Thursday, August 25, 2011

Collar Seeding Pictures

A few pictures of the collar seeding process.

Here we are preparing the seedbed with a spiker to create holes for the seed to go into. This allows the seed to germinate and be protected until it can grow to the surface:


Here Assistant Superintendent Josh Jobson is putting down the Pennlinks II creeping bentgrass seed on hole #11:



Afterwards we roll to keep everything smooth and ensure good seed to soil contact. Longtime Fieldstone associate Juan Nunez on green #12:

Tuesday, August 23, 2011

Seeding

Today we began seeding collars. We are approximately half way through the course. Tomorrow morning we will finish this up. Also, tomorrow we will shut down half the driving range tee for aggressive aerification and seeding.

No pictures today but will post some tomorrow of these processes.

Monday, August 22, 2011

Weekly Schedule for August 22-28, 2011

Weather and unforeseen conditions can/will change the schedule.

This will be a very busy week for us so check in each day for lots of updates to the blog.

Today we are verticutting and topdressing greens. I've been putting on them afterwards and they are smooth and fast. There should be little to no remnants of any work done on the greens after mowing tomorrow (Tuesday).

We are also seeding collars and green surrounds this week. As we go through this process I'll be posting pictures and maybe a video or two!