New Slit Seeder
We were fortunate to receive a brand new slit seeder this past week for fairways and tees. The machine is a TriWave 45 from TurfCo. What previously took hours to seed by hand can now be done in minutes.
Once we slit seed, topdressing is applied then dragged in. Our goal is to have germination within two weeks and let the young plants mature the rest of the Fall and Winter. Once Spring hits with warmer soil temps the plants will rapidly spread laterally into the bare areas.
#6
We are moving along slowly but surely with the conduit for the future fan at #6. As can be seen from the pictures above we have run into a large quantity of rocks while trenching.
Wednesday, October 12, 2016
Monday, October 10, 2016
Weekly Schedule for October 10-16, 2016
Weather and unforeseen conditions can/will change the schedule.
-Leaf blowing and mulching
-Finish installing conduit at #6 green
-Install specialty irrigation in surrounds behind #6 green
-Sod #6 green surrounds
-Seed thin areas in tees and fairways
-Leaf blowing and mulching
-Finish installing conduit at #6 green
-Install specialty irrigation in surrounds behind #6 green
-Sod #6 green surrounds
-Seed thin areas in tees and fairways
Wednesday, October 5, 2016
#6 Green Surrounds and Greens Height of Cut
#6 Green Surrounds Update
We completed the moving of irrigation heads around #6 green to improve spacing today. Rocks were found anywhere we wanted to trench which caused the work to take longer than expected. Thursday and Friday we will be installing conduit for power to a fan that will be installed in the future on this green. Next week specialty irrigation will be installed in the rough directly behind the green. With good weather and no unexpected delays we plan on sodding the surrounds by the end of next week.
Greens Height of Cut
#6, #11 and #14 greens are being mowed at a slightly higher height of cut than the rest of the greens. We are slowly lowering the height of cut on these greens every other day to match the height of cut on the greens throughout the rest of the course.
We completed the moving of irrigation heads around #6 green to improve spacing today. Rocks were found anywhere we wanted to trench which caused the work to take longer than expected. Thursday and Friday we will be installing conduit for power to a fan that will be installed in the future on this green. Next week specialty irrigation will be installed in the rough directly behind the green. With good weather and no unexpected delays we plan on sodding the surrounds by the end of next week.
Greens Height of Cut
#6, #11 and #14 greens are being mowed at a slightly higher height of cut than the rest of the greens. We are slowly lowering the height of cut on these greens every other day to match the height of cut on the greens throughout the rest of the course.
Monday, October 3, 2016
Weekly Schedule for October 3-9, 2016
Weather and unforeseen conditions can/will change the schedule.
-Moving irrigation heads at #6 and #13 greens
-Sodding greens surrounds at #6 and #13 to Turf Type Tall Fescue
-Moving irrigation heads at #6 and #13 greens
-Sodding greens surrounds at #6 and #13 to Turf Type Tall Fescue
Tuesday, September 27, 2016
Weeky Schedule for September 26-October 2, 2016
Weather and unforeseen conditions can/will change the schedule.
-Finish hand seeding and topdressing greens
-Move location of irrigation heads at #6 green
-Sod to Turf Type Tall Fescue #6 green surrounds
-Finish hand seeding and topdressing greens
-Move location of irrigation heads at #6 green
-Sod to Turf Type Tall Fescue #6 green surrounds
Thursday, September 22, 2016
Seeding of Greens
In order to promote full recovery on greens we are lightly seeding and topdressing areas of greens that lack turf coverage.
First we take a hand spike and make slits in two directions.
Then we hand sow the seed. This particular seed is coated in "Yellow Jacket" to improve moisture uptake which will lessen the time for germination and increase percent of germination.
Then the area is topdressed with sand and fertilizer.
Hope to see these areas germinate in 5-7 days. In the meantime expect seeded areas to be watered lightly more often than areas without seed.
First we take a hand spike and make slits in two directions.
Then we hand sow the seed. This particular seed is coated in "Yellow Jacket" to improve moisture uptake which will lessen the time for germination and increase percent of germination.
Then the area is topdressed with sand and fertilizer.
Hope to see these areas germinate in 5-7 days. In the meantime expect seeded areas to be watered lightly more often than areas without seed.
Saturday, September 17, 2016
USGA Northeast Region Update-9.16.16
COURSE CARE
Truth And Consequences
September 16, 2016
By Elliott Dowling, agronomist, Northeast Region and David Oatis, regional director, Northeast Region
COURSE CARE
September also marks the unofficial start of fall projects. Golf courses rely on fall projects and cultivation to improve turf health and playing conditions for next season. Unfortunately, the unseasonably hot, dry weather has caused some courses to scale back cultivation programs and postpone golf course improvement projects. If your grass is too weak to sustain traditional fall cultivation, implement a less-aggressive approach by using smaller tines and less sand until the weather improves. When the weather breaks, perform additional cultivation if it is needed to promote long-term improvement.
The silver lining of a difficult season is that infrastructure deficiencies are highlighted such that they are difficult to ignore. This fall is a good time to think about turning some of your course's weaknesses into strengths.
- Irrigation coverage—For courses that have experienced extremely dry conditions, now is a perfect time to document irrigation problems related to pumping, supply, control, coverage and other factors. Act soon before regular rainfall erases irrigation coverage problems that drought has exposed. If you haven't developed a drought emergency plan, this year has certainly shown why it is important to do so.
- Drainage—Irrigation often gets top billing, but nothing is more important than getting rid of excess water when it arrives in copious quantities. Keep in mind that surface and subsurface drainage are equally important. If your greens don't have good internal drainage, implement a deep soil-modification program or install an internal drainage system.
- Trees—Trees on a golf course can add beauty and strategy, but they also shade the turf, compete for moisture and can clog drain lines. Extremely wet or extremely dry, tree roots can cause problems.
- Fans—Fan technology has improved tremendously in recent years. Having one or more portable, gas-powered fans will provide another level of protection when faced with difficult summer weather. Some courses may have been able to avoid turf loss this summer if they had used a fan for a few weeks.
- Grass species—Breeding programs are continually developing new and improved turfgrass cultivars. If you have old “grass technology” it may be time to upgrade to a species or cultivar that can better withstand heat, drought, wear and disease.
Subscribe to: